CLIENTS

Project Name: Strandherd Armstrong Bridge
Project Value: $43,000,000.00
Owner: City of Ottawa
Consultant: Delcan

Project Particulars:
Design Build of Structure Launch System

  1. Installation and Removal of Temporary Pile Bents
  2. Launch and De-launch of Temporary Trusses
  3. Assembly of Cable Stay Arch Trusses and Deck System
  4. Launch of Cable Stay Structure

Cable Stay Structure on World Heritage Site


Project Name: Medicine Hat Bridge Rehab
Project Value: $11,567,041.15
Owner: Alberta Transportation
Consultant: Dillon Consulting Ltd.
Project Particulars:


Project Name: One Mile House Viaduct
Project Value: $24,000,000.00
Owner: Province of New Brunswick – Department of Transportation and Infrastructure
Consultant: EXP Inc
Project Particulars:

Supply and installation of pot bearing assemblies, , fabrication of erection of bridge girders (both precast/prestressed concrete and structural steel), construction of a cast in place high performance concrete deck, application of deck waterproofing system and asphalt paving.


Project Name: Saint John Harbour Bridge Rehabilitation
Project Value: $32,000,000
Owner: Province of New Brunswick Department of Transportation and Infrastructure
Consultant: Buckland & Taylor Ltd.
Project Particulars:

Partial Deck Reconstruction with removal via hydrodemolition replacement of expansion joint assemblies, construction of new cast in place concrete and structural steel bridge parapet barrier systems, placement of new Rosphalt 50 asphalt wearing surface and electrical upgrades including new bridge lighting system.


Project Name: Paint Lake Rehab
Project Value: $1,124,660.00
Owner: The District Of Muskoka
Consultant: Triton Engineering Services
Project Particulars:

Complete deck and girder removal, Structural steel coating of tube piles, Removal of ballast wall and wing wall, Construct new ballast walls, wing walls, deck, parapet walls and approach slabs, Waterproof the bridge deck, and install box beam parapet railing.


Project Name: Hwy 401 – 3 locations
Project Value: $548,472.00
Owner: MTO c/o Miller Paving Limited
Consultant: N/A
Project Particulars:

  • Bridge deck water proofing
  • Expansion joint seals
  • Rout and sealing
  • Jacking
  • Proprietary patching
  • Full depth and partial depth concrete removals
  • Bridge deck overlay and approach slabs
  • Bridge deck waterproofing and rout and sealing
  • Bridge deck soffit repairs and refacing abutments

Project Name: Kapuskasing Bridge Rehab
Project Value: $460,621.94
Owner: Ontario Northland Transportation Commission
Consultant: Hatch Mott MacDonald
Project Particulars:

Structural bearing replacement and minor concrete repairs


Project Name: Demolition, Construct SPCSP Culvert
Project Value: $1,015,077.00
Owner: Alberta Transportation
Consultant: Isl Engineering
Project Particulars:

Fabricated and installed twin culverts


Project Name: 100th Ave Bridge Rehabilitation

Project Value: $2,016,924.00
Owner: City Of Grande Prairie
Consultant: ISL Engineering
Project Particulars:

Removed and installed girders, form and pour bridge deck


Project Name: Hardisty Hwy 12 Bridge Rehab
Project Value: $1,375,404.54
Owner: Alberta Transportation
Consultant: AECOM
Project Particulars:

Partial depth repair on the bridge deck, Expansion Joint Removal & Replacement


Project Name: Bridge Rehab and other work Stony Plain

Project Value: 1,586,176.00
Owner: Alberta Transportation
Consultant: MOST Engineering (2001) Ltd


 

Project Name: Severn River Bridge Replacement
Project Value: $1,121,792.6
Owner: The County Of Simcoe
Consultant: CC Tatham & Associates
Project Particulars:

  • Complete bridge deck removal and replacement
  • Jacking for bearing replacement and upgrades
  • Ballast and wingwall removal and replace to an integral-abutment
  • Metal traffic barrier railing
  • Minor patch repairs on abutments
  • Waterproofing bridge deck

 

Project Name: West Nose Creek
Project Value: $4,305,535.00
Owner: Alberta Transportation
Consultant: AECOM Canada Ltd.
Project Particulars:


Project Name: One Tree Creek
Project Value: $1,479,620.00
Owner: Alberta Transportation
Consultant: ISL Engineering and Land Services
Project Particulars:

Bridge removal and install new bridge, concrete box culvert extension on North and South sides of road


Project Name: Hwy 400 Bayfield Rd
Project Value: $1,070,077.00
Owner: Bob Hendrickson Construction Ltd.
Consultant: Stantec Consulting
Project Particulars:

Structural Shotcrete Repairs


Project Name: Hwy 124 MTO 2013-5126

Project Value: $1,135,438.00
Owner: Fowler Construction Company
Consultant: UR Consulting
Project Particulars:

Complete bridge restoration of approach slabs, barrier walls and deck. New bearings and structural steel. Coating of all structural steel and waterproofing of the deck.


 

Project Name: Hebron GBS Project
Project Value: $740,900.00
Owner: Kiewit Kvaemer Contractors
Consultant: NA
Project Particulars:

Shotcrete Services – scope of work consists of structural repair to the Hebron Gravity Based Structure (GBS) by low pressure shotcrete utilizing a modified BASF MasterEmaco S 488CI Repair Motar.


 

Project Name: Hwy 567 EBL over Hwy 2 NBL & SBL in Airdrie
Project Value: $978,460.00
Owner: Alberta Tranportation
Consultant: Aecom
Project Particulars:

Partial and full depth concrete repairs to the deck. HPC deck overlay with steel fibers, transition paving of the bridge.

 


 

Project Name: Chapel Arm, Southwest Rive Bridge
Project Value: $620,745.00
Owner: Department of Transportation and Works
Consultant: NA
Project Particulars:

Rehabilitation of two bridge structures; the Southwest River Bridge located along the Trans Canada highway and the Chapel Arm Bridge located along route 201. General scope of work: structural repairs to concrete deck, expansion joint replacement, resurfacing curbs, asphalt paving, replacement of damaged handrail and guide rail upgrades.


 

Project Name: Bridge Rehabilitation Various Structures
Project Value: $597,871.00
Owner: City of St. John’s
Consultant: Nova Consultants Inc
Project Particulars:

City of St. John’s 2014 bridge rehab/maintenance program, including: repair work to 6 structures throughout the city. Concrete Repairs, upgrade of Bridge rail to new Aluminum Rail system & structural strengthening utilizing fiberglass reinforcing.


 

Project Name: Big Brook Bridge Repair
Project Value: $2,398,010.00
Owner: Public works and Government Services Canada
Consultant: Merdian Engineering
Project Particulars:

Rehabilitation of the Big Brook Bridge in Terra Nova National Park, NL. Partial Deck removal and reconstruction of the concrete deck, curb and soffit replacement, expansion joint replacement, new structural steel bridge rail, substructure concrete repairs, approach guardrail upgrades & repainting of structural steel girders – including removal & lead abutment of existing paint system.


 

Project Name: Hebron GBS Project – Grout Pumping
Project Value: $20,550.00
Owner: Pennecon Heavy Civil Ltd.
Consultant:
Project Particulars:

Grouting Services- grouting of voids in a caisson structure for teh “Topsides” component of the Hebron Gravity Based Structure.


 

Project Name: University of Saskatoon Bridge Rehab
Project Value: $4,012,760.00
Owner: City of Saskaton
Consultant: CH2M Hill Canada Ltd
Project Particulars: Deck rehabilitation and structural repairs to a historic multi-span bridge in Saskatoon.


 

Project Name: Various Bridge Rehab in Brampton
Project Value: $2,470,299.00
Owner: City of Brampton
Consultant: The Sernas Group Inc. (AGHD Company)
Project Particulars: Various bridge rehabs throughout Brampton. Work consists of bridge jacking, concrete repairs and expansion joint replacement.


Project Name: Shoal Cove Brook Bridge Replacement
Project Value: $2,125,000.00
Owner: Public Works & Government Services Canada
Consultant:
Project Particulars: Replacement of the Shoal Cove Brook Bridge on Route 430 in Gros Morne National Park. Work includes construction of a new cast in place concrete rigid portal frame structure and the construction of an approximate 500m section of Route 430 for realignment onto the new structure. Work on the route 430 realignment includes clearing/stripping of the new right-of-way, rock excavation (drill & blast) grading, granular base courses and asphalt paving. Also included in the scope of work is demolition of the existing bridge structure and guiderail upgrades.


Project Name: Stoney Brook Bridge Rehabilitation
Project Value: $1,066,740.00
Owner: Department of Transportation and Works
Consultant:
Project Particulars: Construction of a new bridge structure to replace the existing on local road to the Salmonoid Interpretation Centre in Grand Falls-Windsor, NL. The new structure consists of the steel panel bridge (mabey model) on cast in place concrete abutments. Also included is the reconstruction/realignment of the local road to accommodate the new structure. Work on the realignment consists of clearing/stripping, excavation & backfill to required grades, granular base courses and asphalt paving.


Project Name:Blackmarsh Road Br. Rhab
Project Value: $2,913,562.00
Owner:Department of Transportation and Works
Consultant:
Project Particulars: HHC was awarded the contract for the construction of the Blackmarsh Road over Team Gushue Highway bridge structure- this project is part of the larger Team Gushue Highway Extension work currently under construction.
The structure consists of a post tensioned cast-in place concrete superstructure deck slab supported on a cast-in-place concrete substructure. Other aspects of the work include Mechanically Stabilized Earth Wing walls, Deck Waterproofing, Asphalt Paving and Bridge Railing


Project Name: Caribou Phase 2 Repairs, Pictou , NS
Project Value: $3,272,621.25
Owner: Department of Public Works and Government Services Canada (PWGSC)
Project Particulars: Project involves work at the Ferry Terminal in Caribou, NS. The existing wharf infrastructure is a combination of Structural Steel Sheet Piling and Concrete Cribs. Scope includes the construction of the cast-in-place concrete cope wall to provide protection to the existing steel sheet piling. Repairs to deteriorated areas of the steel sheet piling were also completed in conjunction with construction of the cope wall. Also included is the removal and restoration of deteriorated areas on the concrete crib structures and the supply and installation of a number of new fendering systems.


Project Name: Diefenbaker Bridge Barrier and Rail Repair/Replacement Project
Project Value: $2,973,311.25
Owner: City of Prince Albert
Project Particulars:
Removal and replacement of the traffic and pedestrian barriers along the 7 span, 305m long structure. In addition to the removal and replacement of the concrete traffic barrier and the steel pedestrian barriers, HHC performed concrete rehabilitation works to the sidewalks, structure soffits and fascia along the length of the structure.


Project Name: Carrying Hwy. 24 over the Bow River, S.E., Carseland, AB
Project Value: $1,769,113.00
Owner: Minister of Transportation of the Province of Alberta
Consultant: Dillon Consulting Ltd
Project Particulars:
Removal and replacement of concrete overlay with high performance concrete with steel fibers. Additional repairs include jacking of structure to repair bearings, installation of new intermediate, under-slung steel diaphragms and misc. partial depth concrete repair to various structural components.


Project Name: Idylwyld Drive Overpass at Ruth Street Rehabilitation, SK
Project Value: $3,362,273.00
Owner: The City of Saskatoon
Consultant: ISL Engineering
Project Particulars:
Removal and replacement of the structural deck of the multispan, 112m Ruth Street Overpass. The Idylwyld structure is located on one of the busiest sections of highway in Saskatoon and is being completed on a tight working day contract. Included in the repairs are partial depth removal of the structural deck and replacement with a steel fibre structural deck and overlay. Included in these repairs are removal and replacement of the approach slabs, expansion joints and minor concrete rehabilitation to other structural components.


Project Name: Rehabilitation to Broad Cove Bridge (aka the Eastport Road Causeway Bridge)
Project Value: $1,686,971.00
Owner: Parks Canada Agency
Project Particulars: Project involves the rehabilitation of the Broad Cove Bridge (also known as the Eastport Causeway Bridge). Scope of work involves complete replacement of the bridge superstructure – new bearings, new structural steel girders, new cast in place concrete deck and curbs with GFRP reinforcing, new steel bridge rail, waterproofing and asphalt paving. Also included is rehabilitation work on the substructure including abutment repairs/widening, new ballast walls and new wing walls.

 


Project Name: Rehabilitation of the Port Blandford Causeway Bridge
Project Value: $1,053,625.00
Owner: Newfoundland and Labrador Department of Transportation and Works
Project Particulars: Project involves the extensive rehabilitation of the Port Blandford Causeway Bridge. Scope of work includes (1) repairs to deteriorated areas of the concrete deck, (2) removal and disposal of existing expansion joints, concrete curbs and concrete railings, (3) new reinforced cast in place concrete curbs, (4) new expansion joints (5) new structural steel bridge railing, (6) upgrades to approach guiderail, (7) new asphalt paving, (8) repairs to deteriorated areas on the piers


Project Name: Concrete repairs and remove and replace traffic topping
Project Value: $468,460.00
Owner: Ministry of Central Services
Consultant: J C Kenyon Engineering Inc.
Project Particulars:
Rehabilitation of a parking garage in downtown Saskatoon. Involved the removal and replacement of traffic wearing surface, concrete rehabilitation of waffle slabs and removal and replacement of expansion joints and trench drains. Garage was fully operational at the time of construction.


Project Name: Bridge Rehabilitation at Hwy. 2 Peace River
Project Value: $1,841,650.00
Owner:  Minister of Transportation of the Province of Alberta
Consultant: Dialog Design
Project Particulars:
Concrete rehabilitation of the Grouard Trail flyover structure and the 100th street overpass in Peace River. The project involves removal and replacement of deteriorated concrete, removal and replacement of HPC concrete deck overlay and misc structure upgrades and refurbishment.  Project is located in a highly travelled section of Hwy 2; coordination and maintenance of traffic is paramount.


Project Name:  Bakers Brook Bridge, Hwy 430, Gros Mourne National Park
Project Value: $6,504,983.00
Owner:  Parks Canada
Consultant: Harbourside Engineering
Project Particulars:  HHC was contracted by Parks Canada to replace Bakers Brook Bridge in Gros Morne National Park. This project comprised of construction of a double lane, 54m temporary bailey bridge, demolition and removal of the existing concrete bridge structure, and installation of a 44m double steel girder bridge with concrete piled abutments and deck. Once completed, HHC will remove the temporary bridge, and revitalize the surrounding landscape and with the installation of over 800 trees and shrubs.


Project Name:  Old Bay’s Bull Overpass, Manuels River Spillway Culverts
Project Value: $302,000
Owner:  Department of Transportation and Works
Consultant: Department of Transportation and Works
Project Particulars:  Work for this project was completed under the provincial Newfound and Labrador Department of Transpiration and Works Bridge rehabilitation program. The work mainly comprised of the underside concrete rehabilitation of a 4 lane highway heading into the heart of the St. John’s Downtown core.



Project Name:  Pattison Bridge Repair, Calgary, AB
Project Value: $399,582
Owner:  City of Calgary
Consultant: City of Calgary
Project Particulars:  The Pattison Bridge (1st Street SE) over Elbow River is a two-span 60.554m in length; four-lane one-way traffic bridge over the Elbow River in downtown Calgary with a clear roadway width of 14.737m. The Scope of Work for this project includes the removal and disposal of the existing PMA on the deck, roadway asphalt and the existing joints on both abutments. The deck shall be paved with Polymer Modified Asphalt, and a Thorma Joints (Hot Poured Asphaltic Plug Joint) shall be installed on the abutments and pier joint locations. Prior to paving with new PMA and installing the new plug joints, the concrete repairs on the deck and the joint locations shall be completed.


Project Name:  NSY Gulfspan Dock Fender Installation, North Sydney NS
Project Value: $2,997,025
Owner: Marine Atlantic
Consultant: CBCL Ltd
Project Particulars:  As part of Marine Atlantics ferry dock upgrades in North Sydney, HHC was awarded a contact which mainly comprised of concrete modifications as required for the new fender system, removal and installation of the new fender system supplied by Marine Atlantic, Installation of a new bulbous bow fender which required removal of the existing fender, modifications to the existing foundations and required the underwater installation of a new foundation and existing concrete modifications.


Project Name:  PAB Alternate Dock Fender Installation, Port Aux Basque, NL
Project Value: $1,986,550
Owner: Marine Atlantic
Consultant: CBCL Ltd
Project Particulars:  As part of Marine Atlantics ferry dock upgrades in Port Aux Basque, HHC was awarded a contact which mainly comprised of concrete modifications as required for the new fender system, removal and installation of the new fender system supplied by Marine Atlantic, Installation of a new stop fender and removal/modification of the existing concrete nosing at the end of the ferry dock.


Project Name: PAB Gulfspan Dock Automated Mooring
Project Value: $4,098,500
Owner: Marine Atlantic
Consultant: CBCL Ltd

Project Particulars: installation of new concrete foundations, structural steel access platforms, electrical, and communications to operate new automated Mooring system. Also included in the scope of work was removal and replacement of existing ladders, guide fenders, and the installation of a new stop fender truss assembly on the wharf.


Project Name:  49th Ave. Red Deer River Bridge – Girder Strengthening
Project Value: $1,053,200
Owner: City of Red Deer
Consultant: Lex 3 Engineering
Project Particulars:  Installation of a work platform and Carbon Fiber Reinforced Polymer system for the girder strengthening on the 49th Ave. Bridge over the Red Deer River in the City of Red Deer.


Project Name:  Duggan Bridge Minor repairs
Project Value: $156,540
Owner: City of Edmonton
Consultant: Associated Engineering
Project Particulars:  Repairs to Duggan Bridge that is located on Saskatchewan Dr. over Fort Hill Road in the City of Edmonton. The work involved, traffic control, substructure delamination repairs, epoxy crack injection to the girders, grouting of bearing brackets, repair of deck cracks and application of silane sealer to the deck and sidewalks.


Project Name:  Hwy. 41 over Battle River, 18 km N. of Wainwright. Central Region
Project Value: $949,000
Owner: Alberta Transportation
Consultant: LEX3 Engineering
Project Particulars:  Rehabilitation of a bridge carrying Hwy. 41 over Battle River, 18 km N. of Wainwright AB. The work includes traffic accommodation, concrete repairs to substructure,  abutment seat and pier cap modifications to facilitate the jacking of the bridge and replacing of all 36 bearings, deck drain extensions and concrete cleaning and sealing.

 


Project Name:  High Load Damage and O/W. BF 75667 Hwy 616 over Hwy 2. 8 KM West of Millet
Project Value: $756,800
Owner: Alberta Transportation
Consultant: Most Engineering
Project Particulars:  A vehicle collision and ensuing fire severely damaged the middle pier (Pier 2) and three girders in Span 2 on a Bridge carrying Hwy 616 over Hwy 2 Near Millet Alberta. HHC has been awarded the contract to complete the repairs to the bridge including, traffic accommodation, concrete repairs to the pier and girder legs, carbon fibre reinforced polymer repair and installation, pressure washing and sealing of the underside concrete.

 


Project Name:  Emergency Repairs to the Fixed Loading Ramp at St. Bare Wharf
Project Value: $313,250
Owner: NL Transportation and Works
Consultant: Dillon Consulting
Project Particulars:  Emergency Repairs to St. Barb ferry ramp includes the repair to existing voids on the timber crib ramp using new structural timbers and tremie concrete to fill the void.

 


Project Name:  Bridge Rehab Cum196, Route 321 U/P Oxford Bridge
Project Value: $550,043
Owner: NSTIR
Consultant: NSTIR
Project Particulars: HHC was contracted by NSTIR to perform concrete repairs to the Oxford Bridge in Nova Scotia. This project involved partial depth repairs to the deck, piers, abutments, and soffit. The bridge deck then received a hot applied waterproofing membrane and new asphalt wearing surface.


Project Name: Rehab 4 Bridges on Hwy 16 and Hwy 4 Near North Battleford Saskatchewan
Project Value: $5,144,708
Owner: Saskatchewan Ministry of Highways
Consultant: WSP
Project Particulars:  Involved the rehabilitation of 4 bridges in Battleford Saskatchewan. Items of work included traffic control, asphalt removal, concrete repairs on substructures and superstructures, deck joint replacement, bridge jacking, bearing replacement, complete removal and replacement of CIP concrete barrier walls on all 4 bridges, bridge rail replacement, waterproofing and paving .
Traffic control set up and monitoring was self performed and was a very big part of this project as work proceeded on all 4 bridges at once using staged construction.


Project Name: EDGAR INDUSTRIAL DRIVE / CPR BRIDGE REHABILITATION File # 1090-2018-266
Project Value: $571,110
Owner: The City of Red Deer
Consultant: Morrison Hershfield Ltd
Project Particulars:  Involved rehabilitation of the Edgar Industrial Drive Bridge, major items of work included replacement of deck joints, removal and reconstruction of sections of concrete barrier walls, bridge jacking and replacement of bearings. Work was completed in stages while allowing alternating traffic to pass thru the site.


Project Name: BRIDGE REHABILITATION AND OTHER WORK 2:48 B.F. 75752 – Carrying Hwy. 2 over Nine Mile Creek, 3 km S.E. of Widewater NORTH CENTRAL REGION
Project Value: $882,648
Owner: Minister of Transportation of the Province of Alberta
Consultant: Most Engineering
Project Particulars: Involved the rehabilitation of a bridge carrying Highway 2 over Nine Mile Creek near Slave Lake Alberta. Major items of work included asphalt removal, concrete repairs, construction of concrete end diaphragms and approach slabs, repairs to bridge rail anchor bolts, re-painting of the steel pipe piers, waterproofing and paving.


Project Name: Bridge Rehabilitation, One Project in Inverness County, Project 1 INV200 Point Tupper RR Overpass
Project Value: $1,114,498
Owner: NSTIR
Consultant: NSTIR
Project Particulars: Construction of a new concrete footing for the south abutment structure with post-tensioned rods tying the existing structure into the new structure. This included the supply and installation of aggregates to allow for drainage around the structure. Replacement of bridge bearings, guardrails and asphalt wear surface for the bridge structure and the approach areas. Construction of a concrete approach slab to tie into the existing deck concrete to reduce deck loading onto south abutment structure. Concrete repairs were completed to the deck structure as well as the existing south abutment structure.


Project Name: Hanson Ranch Culvert Repair (Hidden Creek Drive NW)
Project Value: $561,800
Owner: The City of Calgary
Consultant: Dillion Consulting Limited
Project Particulars: Involved the supply and installation of an 8m Wide X 18m long section of deep structural steel plate liner inside an existing open bottom 50m long culvert that carries Hidden Creek Drive NW over West Nose Creek in Calgary. The liner installation was required to support a section of culvert that had deflected due to a suspected washout of materials from behind the existing culvert. Once installed a polymer resin was injected behind the side walls of existing culvert and between new liner and existing culvert.


Project Name: BRIDGE REHABILATION Grande Anse Bridge (Pleasant Bay Parks Canada Co Dexter)
Project Value: $763,232
Owner: Parks Canada C/O Dexter (SUB)
Consultant: Santec
Project Particulars: HHC completed the rehabilitation of the bridge that carries the Cabot Trail over the Grande Anse River located in the Cape Breton Highlands National Park in Nova Scotia. The owner was Parks Canada and HHC completed the work under a Sub-Contract for Dexter Construction Company limited. The main items of work included traffic controls, asphalt removal, concrete repairs, removal and recasting of curbs, new bridgerail, deck drain replacement, replacement of deck joints, bridge jacking, bearing replacement, applying concrete sealers and deck waterproofing.


Project Name: PAB Stand-off Dolphin Fenders
Project Value: $455,400
Owner: Marine Atlantic Inc.
Consultant: CBCL
Project Particulars: Replacement of existing dolphin fender steel and associated components. Concrete repair works to Dolphin Fender structure #2 to allow for new Dolphin Fender Assemblies to be installed.

 


Project Name: NSTIR 2019-113 One Project in Lunenburg County
Project Value: $967,649
Owner: NSTIR
Consultant: NSTIR
Project Particulars: This structure required concrete repairs to various structures supporting the bridge deck as well as the deck itself. Work included replacement of asphalt wear surfaces, guardrails, asphalt plug joints and bridge bearings. The supporting steel structures were stripped of its aged corrosion- coated and repainted to industry standards. This structure required concrete repairs to various structures supporting the bridge deck as well as the deck itself. This included repairs to the pre-cast concrete girders supporting the deck concrete. Work also included replacement of asphalt wear surfaces, guardrails, asphalt plug joints and bridge bearings. This structure required replacement of several sections of metal bridge railings along the sidewalks.


Project Name: Rehab of Maymont Bridge Hwy 376 over North Sask. River
Project Value: $1,536,276
Owner: The Ministry of Highways & Infrastructure
Consultant: Stantec Consulting Ltd.
Project Particulars: Install and manage environmental protections for migratory birds & local natural habitats. Removal of bridge deck and approach asphalt, partial and full through deck concrete remediation, sandblast & seal concrete deck. Place new asphalt paving over concrete deck and approaches. Replace slope drainage with concrete drain troughs and RipRap. Erect suspended under-bridge decking to access concrete soffit repairs. Remove and install new crash-barrier / guardrails.


Project Name: Bridge Rehab Hwy 2 over 53, West of Ponoka
Project Value: $2,683,691
Owner: Alberta Transportation
Consultant: Dialog Alberta Architecture Engineering.
Project Particulars: Milling of bridge deck and approach asphalt, partial and full through deck concrete remediation. Place & finish all concrete, including deck overlay, utilizing mechanical Gomaco deck screed and tining texture finish. Concrete restoration & hydraulic grouting of head-slopes. Excavation & install drainage services, concrete drain troughs, and RipRap. Hydraulically jack bridge decks to replace all bridge bearings. Install of new deck joints. Install new Over Height Vehicle Detection System for all approaching routes.


Project Name: Rehab of Finlay Bridge located in Medicine Hat AB.
Project Value: $1,576,819
Owner: City of Medicine Hat
Consultant: Associated Engineering Alberta Ltd.
Project Particulars: A 274m historical steel bridge built in 1908. Removal of bridge deck and approach asphalt. Prep the original deck timbers—partial spike 75,000 nails for bonding a new concrete overlay with steel fiber concrete & stainless steel rebar. Demolish & rebuild bridge back walls. Demolish and rebuild Mechanically Stabilized Earth wall. Hydraulically jack a full span of the bridge structure to restore it to its original built position. Place & finish all concrete, including overlay, utilizing mechanical deck screed and tining texture finish. Replace deck joints and miscellaneous bridge upgrades, including landscaping and asphalt paving.


Project Name: Rehab of Union Street Underpass TCH Km 430.5 in Grand Falls Windsor NL.
Project Value: $991,021
Owner: Newfoundland Dept of Transportation
Consultant: Newfoundland Dept of Transportation
Project Particulars: Removal and reinstatement of bridge deck and approach asphalt, partial demolition and reconstruction of bridge deck sidewalk, demolition and rehabilitation of bridge deck soffit and pier column concrete defects, reconstruction of approach sidewalk, curb, gutter, and guide rail Installation.


 

Project Name: Wharf and Pier Repairs Halifax and Dartmouth
Project Value: $2,627,711
Owner: Halifax Regional Municipality
Consultant: Pinto Engineering.
Project Particulars: Completed land based and Underwater rehabilitation/repairs to multiple wharfs and piers, at both the Halifax and Alderney Landing Ferry Terminals. Scope of work included Steel H-Pile Rehabilitation ,Pile Jacket Installation, Application of 4 stage Wasser Coating Systems , Installation of Steel Casings and Concrete Infill, Installation of Cathodic Protection Anodes, Demolition & Reinstatement of timber sheathing, walers, decking, curbs, etc., Demolition and replacement of multiple concrete decks and topping slabs, Under wharf concrete beam repairs. Demolition and Replacement of electrical and mechanical systems, Completed repairs to the existing corrosion protection system.


Project Name: Rehabilitation of 16th Ave. Bridge over Crowchild Trail
Project Value: $1,551,209
Owner: City of Calgary
Consultant: City of Calgary
Project Particulars: This project involved repairs to both the top and underside of the bridge. The main items of work on this project were: Development of traffic control plan to allow passage of traffic thru the worksite at all times with the least amount of disruption. Removal and disposal of existing asphalt pavement and concrete gutters. Replacement of existing PMA with new 50mm PMA with extension to gutter line. Concrete median repair works. Repair of girder shear keys. Replacement of median expansion joints. Concrete girder repairs: Sealing of cracks, Girder surface patching, Girder partial depth repair. Strengthening of girders with CFRP strips. Application of silane sealer on new and repaired concrete.


Project Name: Rehabilitation of Mckenzie Road over Highway 2 located in the City of Red Deer
Project Value: $1,038,350
Owner: Border Paving
Consultant: Lex 3 Engineering inc
Project Particulars: The main scope of the work items on this project were:
Development and implementation of traffic control plans. Removal of the existing asphalt pavement and waterproofing materials. Removal and reinstallation of the concrete median. Partial removal and reinstatement of the South Curb. Concrete deck repairs. Replacement of the East cover plated Expansion Joint. Replacement of the North Bridge rail. Replacement of the approach guardrail on all 4 corners. Application of waterproofing system on the entire deck. Application of silane and pigmented sealers.


Project Name: Rehabilitation of 4 Pedestrian Bridges for the City of Medicine Hat
Project Value: $1,098,786
Owner: City of Medicine Hat
Consultant: Associated Engineering
Project Particulars: The work involved minor maintenance and painting of 4 pedestrian bridges located in the City of Medicine Hat. Because the existing paint contained lead, HHC proposed the use of a painting system that encapsulated the existing paint in lieu of removing it. The main scope of the work items on this project were: Development and implementation of traffic control plans. Development and implementation of Environmental Operation Plan. Design and installation of access scaffolding. Co-ordination with CP Rail on the 2 bridges that were in proximity to the CP Rail tracks. Washing and painting of 4 pedestrian bridges. Preparation and application of waterproof anti-skid coating on deck surface. Minor concrete repairs. Weld inspections and weld repairs to existing structure cross bracing. Supply and Installation of steel mid rail on one of the structures. Application of silane and pigmented sealers.


Project Name: Deck Rehabilitation of Nackawic River Bridge
Project Value: $983,374
Owner: New Brunswick Deptatment of Infatructure and Transportation
Consultant: EXP Services Inc.
Project Particulars: The scope of work for this project involved rehabilitation of the existing concrete deck, replacement of the steel girder splice plates, supply, and installation of a new expansion joint drain trough. Key highlights of the project are: Demolition and full concrete overlay of the bridge deck. Installation of Armour Bridge 45 (IKO) waterproofing system. Asphalt paving of new bridge deck. Supply and install new splice plates for girder repair. Supply and install new expansion drain trough. Complete repairs to existing watermain blow off valve.


Project Name: Florenceville River Bridge Rehabilitation – Phase 3
Project Value: $3,550,342
Owner: New Brunswick Deptatment of Infatructure and Transportation
Consultant: EXP Services Inc.
Project Particulars: This project involved rehabilitation of the concrete deck and bridge soffit of the 6 span concrete approach structure. Also included was the replacement of the pot bearings at pier 8. Since the structure is made up of a voided deck slab, a rigid shoring system was required to be in place prior to undertaking the deck rehabilitation. Key highlights of the project are: Analysis and testing of existing subgrade as well as construction of engineered subbase and concrete slabs to ensure adequate bearing capacity for the shoring system. Design, supply, and installation of 112 temporary shoring towers. Demolition and full overlay of voided concrete deck slab, including new sidewalks and steel bridge railing. Concrete repairs on the bridge abutment and approach as well as repaving of the approach. Development and trialing of a project specific self-consolidating concrete mix design. Rehabilitation of the bridge soffit, using self-consolidated concrete. Replacement of Bridge Pot Bearings at pier 8, including design of temporary bearings and development of jacking procedures.


Project Name: Replacement of Expansion Joints of 6 Bridges
Project Value: $1,529,400
Owner: City of Calgary
Consultant: City of Calgary
Project Particulars: The work involved removal and replacement of expansion joints and seals on 2 Pedestrian and 4 highway bridges located in the City of Calgary using staged construction to allow for continuous traffic flow thru the work sites. The main scope of the work items on this project was: Development and implementation of traffic control plans. Removal and replacement of expansion joints on Crowchild Trail over University Drive Bridge. Removal and replacement of expansion joints on Beddington Trail NW ( Both North and Southbound Bridges) over Harvest Hill Blvd. Removal and replacement of expansion joints on Country Hills Blvd ( Both East and Westbound Bridges) over West Nose Creek. Removal and replacement of expansion joints on 25th Ave. NE pedestrian bridge over Deerfoot Trail. Removal and replacement of expansion joints on 26th Ave. SW pedestrian bridge over Sarcee Trail. Replacement of existing joint seals on 8th Ave over Deerfoot Trail bridge.


Project Name: Rehabilitation of Highway 25 over Highway 3 Interchange Bridges
Project Value: $1,387,080
Owner: Alberta Transportation
Consultant: WSP Canada Inc.
Project Particulars: The work involved the rehabilitation of both the Northbound and Southbound bridges of Highway 25 over Highway 3 in Lethbridge, Alberta. The work on this project involved repairs to both the top and underside of the bridge, using staged construction to allow for continuous traffic flow thru the work sites. The main scope of the work items on this project was: Development and implementation of traffic control plans. Removal of the existing asphalt pavement and waterproofing materials. Deck and Curb concrete and crack repairs. Deck and approach slabs waterproofing and ACP. Drain trough partial replacement. Approach Rail transition replacement. Re-caulking longitudinal joint along the median. Deck joint seal replacement. Jacking of the bridge to repair/reset south abutment bearings. Partial replacement of slope protections. Cleaning and sealing of concrete


Project Name: Red Deer River Bridge on Hwy 54, Innisfail
Project Value: $2,015,274.88
Owner: Alberta Transportation
Consultant: AECOM
Project Particulars: Bridge Rehabilitation and other work on the Red Deer River Bridge located on Highway 54, 6 km NW of Innisfail AB. Major work items included traffic accommodation, Concrete repairs to all elements of the bridge Sub and Super Structure, Installation of a new fiber reinforced deck overlay concrete, Replacement of both abutment finger joints with new cover-plated deck joints, replacement of sections of bridge rail and guardrail, Removal, and replacement of asphalt at approach transitions, installation of drain troughs and application of concrete sealers.


Project Name: Bridge Rehabilitation – Carrying Hwy. 39 over Modeste Creek E of Drayton Valley
Project Value: $3,269,468.59
Owner: Alberta Transportation
Consultant: Most Engineering
Project Particulars: Major work items included traffic accommodation, concrete repairs to all elements of the bridge, complete removal and replacement of the deck curbs and overhangs, removal and replacement of the concrete fiber deck overlay, new approach slabs, girder shear strengthening modifications, new abutment joints, new drain troughs, new guard rail transitions, new bridge rail, transition approach paving and application of concrete sealers.


Project Name: Macdonald Bridge Approach Spans Resurfacing and Expansion Joint Replacement, MacKay Bridge Approach Roads Resurfacing, and K-Ramp Expansion Joint Replacement
Project Value: $4,552,663.03
Owner: Halifax Harbour Bridges
Consultant: Halifax Harbour Bridges
Project Particulars: Horseshoe Hill Construction Inc was contracted HHB for Rehabilitation work at both the MacDonald Bridge and the MacKay Bridge. The work included Resurfacing of the MacDonald Bridge Approach Spans with the application of Striling Lloyds Eliminator waterproofing system. HHC also replaced 2 Expansion Joints at Pier D4 &D6 on the MacDonald Bridge. Included in the contract was Approach Roads Resurfacing, and K-Ramp Expansion Joint Replacement at the MacKay Bridge.


Project Name: Florenceville River Bridge Rehabilitation – Phase 4
Project Value: $19,416,077.00
Owner: New Brunswick Deptatment of Infatructure and Transportation
Consultant: EXP Services Inc.
Project Particulars: Horseshoe Hill Construction Inc was contracted by Provence of New Brunswick for the Phase 4 Rehabilitation of the Florenceville Bridge (F470) located in Florenceville, Carlton County, N.B. The work included the deck rehabilitation and FRP strengthening of the Florenceville bridge main span and South approach span including upgrades to the railing and curbs, expansion joint replacements and modifications to the east abutment and approach to suit the new railing/curb configurations. The work was completed in stages and traffic phasing leaving the bridge open to one lane of traffic. Due to the severe deterioration of the post tensioning withing the structure DTI has engaged HHC to also perform exterior strengthening of the cantilever sections to be partially completed during the winter shutdown.


Project Name: Expansion Joint Replacement – Package A
Project Value: $2,826,770.78
Owner: City of Calgary
Consultant: City of Calgary
Project Particulars:  Horseshoe Hill Construction Inc was contracted by the City of Calgary to provide prime contractor services for the rehabilitation of 17th Avenue Bridge over WID Canal and the 64th Ave bridge over CP-rail. The proposed repairs for both bridges include but are not limited to expansion joints and seals replacement, barrier wall sealing, surface removal by cold milling and paving, barrierwall, deck, abutment, and other miscellaneous repairs.


Project Name: Expansion Joint Replacement – Package B
Project Value: $3,429,641.78
Owner: City of Calgary
Consultant: City of Calgary
Project Particulars: Horseshoe Hill Construction Inc was contracted by the City of Calgary to provide prime contractor services for the rehabilitation of the Bonnynbrook bridge over Bow River and the Southland overpass over the Calgary LRT. The proposed repairs for both bridges include but are not limited to expansion joints and seals replacement, barrier wall sealing, surface removal by cold milling and paving, barrierwall, deck, soffit, and other miscellaneous repairs.